New laminated doors and panels were installed to bring colour into the laboratories and the existing Iroko worktops were cleaned, re-sanded, and re-laquered.

The existing water, gas and electrical service outlets were replaced with new outlets.

New floor finishes, decoration and ceilings brought a new and bright image to the rooms.

The photographs below show the labs before and after.